The construction of construction method piles has been a relatively mature process method, which uses single or multi axis drilling and mixing, and repeatedly mixes with the soil by spraying cement with a drill bit. Before the cement soil mixture is set, steel plates or H-shaped steel are inserted to supplement its stress until the cement is solidified, and finally a seamless rigid underground wall with a certain strength is formed. This construction method is widely used in soft soil foundation, cohesive soil, silt, sand and gravel soil, which need to be excavated vertically.
In the process of pile construction with construction method, due to different geological conditions, the size and length of H-shaped steel are different. This article shares the case of Yongan YZ-180B penetrating the sand layer in Fujian Luanpin Piling project and driving 21 meters in long H-shaped steel!
The project of port construction is to build a rainwater pump station, which adopts an economic and effective solution, namely SMW method. During the construction of jet grouting pile, 300 * 700mm H-shaped steel with a length of 21m shall be driven! In consideration of cost, the construction party leased the electric hammer for construction. At the beginning, 10 meters is relatively easy, but even if the pile is driven for more than 10 meters for half an hour, it is difficult to drive until the hammer is overheated and damaged! Not only equipment loss, but also construction progress is difficult to guarantee. Moreover, there is only a 50t crane on site, so the weight of the hammer must be strictly limited. Light hammer body and large exciting force are the only criteria for hammer selection in this project!
Luanpin Port geological analysis
As early as 2017, Yongan Construction Machinery had a successful case of construction of No. 6 steel sheet pile near the port with resonance free hammer YZ-230F high frequency resonance hydraulic vibro hammer. For low-frequency vibratory hammers at port sites, it is easy to construct within 10 meters of silt layer, but sand layer will be encountered within 10-13 meters, and it is difficult to penetrate steel sheet piles or H-shaped steel!
ecommended equipment YZ-180B hydraulic Vibratory pile driving hammer
Due to 50 ton crane on site, 21 meter long H-shaped steel needs to penetrate the sand layer, Yongan Construction Machinery recommends YZ-180B hydraulic vibration hammer. The hammer weight is 5.7 tons, the exciting force is 171 tons, and the amplitude can be 30.1mm! The key to the success of YZ-180B hydraulic vibro hammer is to achieve high rotational speed, which has a good effect on sand liquefaction. The piling of the equipment on site is very smooth, and one pile can be driven in 10-15 minutes. Boss Zhang at the construction site said: The geological conditions near the port require this hydraulic vibration hammer to drive piles!
YZ-180B has become more and more popular with customers since it was launched in the Chinese market. This kind of universal light equipment, with high rotating speed, high eccentric moment and high pulling force, is widely used. It is not only applicable to the driving and pulling of steel sheet pile composite wall and H-shaped steel, but also has more obvious advantages in the long constructed steel temporary bridge and PC steel pipe pile pulling project.